Installation steps and cooling effect of radiator

作者:Tianli biology點(diǎn)擊:1154
When determining the layout of the radiator, the convection of the indoor hot and cold air should be considered, and the radiator should be close to the entrance of the cold air as far as possible to improve the uniformity of the room temperature distribution. If a room needs more radiators, it is better to install them in groups. If too many column radiators are combined together, their heat dissipation effect will be affected. If the number of assembled chips is compared with this standard group, when each group is less than 6 chips, the heat dissipation of each chip will increase by 5%, while when each group is 11-20 chips, the heat dissipation of each chip will decrease by 5%.
The tandem radiator is easy to be installed separately, and when it is overlapped up and down, the heat dissipation is also reduced. The inlet and outlet pipes should not be set on the same side of the radiator. When installing, the inlet pipe should be slightly raised to facilitate the exhaust.
Installation procedure of radiator
1. Slot the floor or wall. In order to bury the exposed pipeline, the construction team must make a groove on the wall and ground. The depth or width of the groove needs special installation personnel to collect the actual treatment.
2. Lay pipeline and protect card slot. According to the location of the radiator in the early stage, the branch pipe can be slotted and laid. According to the customer's demand, the steel groove can be laid in the branch pipe to protect the pipeline, and the system can be closed and water injected to pressurize.
3. Install the water distributor. The diversity water collector is a water flow distribution and collection device which is composed of a water distributor and a water collector. The water separator should be installed horizontally and cleaned after installation.
4. Pressure test the radiator system. This is a very important step in the radiator installation steps. The specific operation is as follows: close the main pipe connection valve, open the radiator inlet valve, and use the pressure test equipment to test. The test pressure should be 1.5 times of the normal use pressure, and not less than the test pressure of the whole community pipe network. It is qualified if there is no leakage for 3-5 minutes.
5. According to the decoration schedule. Radiator construction and hydropower construction are carried out simultaneously, so as not to affect the construction progress.
6. Install the radiator. Place the radiator stably, connect the valve connector with the inlet and outlet valves, use a level ruler to measure whether the radiator is straight and whether the pipeline installation meets the requirements, and then use a pipe clamp to tighten the connector.
7. The customer checks and accepts the whole radiator system. Usually, when replacing the construction, the workers will reserve the valve on the pipeline. After the installation, the stamping test should be carried out to prove that there is no running, dripping, leaking place before the acceptance can be completed.
8. The radiator system is installed. The whole radiator installation steps are completed, users can smoothly enter the use stage.

AV人摸人人人澡人人超碰妓女|挺进去岳就不挣扎了在线观看|久久精品国产色窝窝综合|欧美日韩国产在线人成|成人午夜视频在线观看|国产精品高潮呻吟av久久suv 广昌县| 蓬安县| 盐边县| 龙井市| 遂溪县| 黔西| 清新县| 北安市| 阆中市| 亳州市| 五峰| 辛集市| 从化市| 克什克腾旗| 津市市| 裕民县| 岳西县| 郴州市| 江油市| 开阳县| 黎平县| 乐山市| 淮北市| 铜梁县| 云霄县| 台湾省| 滨州市| 越西县| 右玉县| 青州市| 中方县| 武城县| 济源市| 金坛市| 浦东新区| 二连浩特市| 塔河县| 越西县| 康保县| 海晏县| 竹北市| http://444 http://444 http://444 http://444 http://444 http://444